air-routes.com

2026.09.07 (58fefa6)

7 results

No direct — 7 connections
CCU → LGW
  • via Amritsar (ATQ) — 10h 51m total
  • via Ahmedabad (AMD) — 11h 27m total
  • via Dubai (DXB) — 11h 31m total
  • via Doha (DOH) — 11h 42m total
  • via Goa (GOX) — 12h 24m total
  • via Bangkok (BKK) — 14h 38m total
  • via Phuket (HKT) — 15h 34m total

How it works — direct flights first; otherwise connections ordered preferring fewer stops (times shown are flying time only), up to seven.
Data refreshed daily · API docs · /api/connections?from=OTP&to=BCN